missing translation for 'onlineSavingsMsg'
Learn More
Learn More
Description
Our Installation IR-moisture Incl. Cert/Travel includes:
- Checking the equipment delivery for completeness and any transport damage
- Professional installation of the equipment components
- Connection of peripheral devices (such as printers)
- Setup of default parameters adaptation to ambient conditions at the place of use
- Initial startup with functional tests
- Initial metrological equipment check
- Instruction of operating personnel (no application training)
- Issuing an installation report
- Consultation on device maintenance and maintenance cycles
- Customer pre requisites: Device is at the installation site and has been sufficiently acclimatized
- The installation place is freely accessible
- Optional Services: Calibration certificate with ISO IEC 17025 accreditation USP certificate USP test report Balance test report Minimum weight certificate according Eur. Pharmacopoeia (2.1.7.) GLP GMP compliant equipment qualification Integration of the devices in laboratory processes
- Remarks: An initial calibration at the place of use is imperative to ensure the traceability of measurement results.
Specifications
Specifications
| For Use With (Equipment) | Arium Water System |
| Product Type | Service |
Product Title
By clicking Submit, you acknowledge that you may be contacted by Fisher Scientific in regards to the feedback you have provided in this form. We will not share your information for any other purposes. All contact information provided shall also be maintained in accordance with our Privacy Policy.
Spot an opportunity for improvement?